DCA1 - Success North |
$154,724.56 per ha |
Contribution towards widening and upgrading of Hammond Road, between Beeliar Drive and Bartram Road, Success. |
DCP1 Report |
DCA4 - Yangebup West |
$41,633.25 per ha |
This is a proportional contribution (40.88 per cent) towards Beeliar Drive, between Stock Road and Spearwood Avenue. |
DCP4 Report |
DCA5 - Yangebup East |
North of Beeliar Drive: $27,577.45 per ha |
This is a proportional contribution (40.88 per cent) towards Beeliar Drive, between Stock Road and Spearwood Avenue. It also includes a contribution towards cost of closing Yangebup Road at the railway line. |
DCP5 Report |
DCA5 - Yangebup East |
South of Beeliar Drive: $29,407.61 per ha |
This is a proportional contribution (40.88 per cent) towards Beeliar Drive, between Stock Road and Spearwood Avenue. It also includes a proportional contribution (30.65 per cent) towards Spearwood Avenue, between Beeliar Drive and Fancote Avenue. |
DCP5 Report |
DCA6 - Munster (Lake Coogee) |
$191,577.96 per ha |
This is a proportional contribution (23.4 per cent) towards widening and upgrading of Beeliar Drive (Mayor Road), between Stock and Cockburn Roads, Munster |
DCP6 Report |
DCA8 - Solomon Road |
$21,028.39 per ha |
This is a proportional contribution to the cost of common infrastructure for the Solomon Road Arterial Drainage System. |
DCP8 Report |
DCA9 - Hammond Park |
$75,078.66 per ha
Lots 51 & 301:
$72,464.85 per ha |
This is a proportional contribution (61.60 per cent) to the cost of widening and upgrading of Hammond Road between Gaebler and Rowley Roads, together with a proportional contribution to the cost of regional drainage infrastructure. |
DCP9 Report |
DCA10 - Wattleup |
$74,710.19 per ha
Lots 1, 2 110 & 111:
$76,999.05 per ha |
This is a proportional contribution (38.40 per cent) to the cost of widening and upgrading of Hammond Road between Gaebler and Rowley Roads, together with a proportional contribution to the cost of regional drainage infrastructure. |
DCP10 Report |
DCA11 - Muriel Court |
There is a calcuation for each lot within this structure plan based on a new lot/dwelling rate of $19,443.77 (please contact the DCP Officer to confirm)
Lots 3 Semple Court:
$2,107,661.26
Lot 52 Semple Court: $346,654.81 |
This is a proportional contribution to cover a number of roads and public open space, together with traffic management devices, and is more extensive than some of the earlier DCPs. |
DCP11 Report |
DCA12 - Packham North |
East of Mell Road: $107,128.01 per ha
West of Mell Road: $114,892.45 per ha |
This is a proportional contribution to land and infrastructure works required as part of the development of the Packham North Development Contribution Area. The proportional contribution is to be determined in accordance with the provisions of TPS3 and this Development Contribution Plan. |
DCP12 Report |
DCA14 - Cockburn Coast
(Robb Jetty and Emplacement precincts) |
There is a calculation for each lot within these two structure plans based on a new/lot dwelling rate of $14,530 (please contact the DCP Officer to confirm)
|
This contribution plan will co-ordinate key infrastructure for the Robb Jetty and Emplacement Precincts. It will provide clarity to developers on the required monetary contribution necessary to deliver the infrastructure items documented in the contribution plan report. |
DCP14 Report |
DCA15 - Treeby/Jandakot |
Treeby:
$1,255.91
per lot/dwelling
Jandakot:
$939.04
per lot/dwelling |
This is a proportional contribution to the cost of works to contruct a multiple use playing field space. |
DCP15 Report |