The City of Melville is delivering traffic signals at the North Lake Road and Winterfold Road intersection.
17 Jul 2017: Modifications to existing Semple Court including closures and pavement modifications shown on the Muriel Court Structure plan. • ... Provision of land for public open space area shown on the Muriel Court Structure Plan and the cost of landscaping and bushland/wetland restoration. •
17 Jul 2017: Structure Plan Area. 400m Walkable Catchment. Railway Station. Proposed Bus Routes. ... 800m Walkable Catchment. to Proposed Bus Routes. to Railway Station. PUBLIC TRANSPORTMURIEL COURT STRUCTURE PLAN,.
17 Jul 2017: to wavesWetlands. SCALE 1:20,000. 0 400m. GNA 6/07. SITE LOCATIONMURIEL COURT STRUCTURE PLAN,.
17 Jul 2017: PLACE. PLACE. HS. SEC. to wavesWetlands. SCALE 1:10,000. 0 200m. GNA 6/07 METROPOLITAN REGION SCHEMEMURIEL COURT STRUCTURE PLAN,.
19 Jul 2017: 650. AutoCAD SHX Text. 450. AutoCAD SHX Text. PLAN VIEW. AutoCAD SHX Text.
19 Jul 2017: USOAK WELL PLAN. AutoCAD SHX Text. 1800 LINER. AutoCAD SHX Text.
19 Jul 2017: AutoCAD SHX Text. PLAN. AutoCAD SHX Text. TABLE -A. AutoCAD SHX Text. ... PLAN. AutoCAD SHX Text. 50mm MORTAR TO SUIT. AutoCAD SHX Text.
19 Jul 2017: AutoCAD SHX Text. PLAN. AutoCAD SHX Text. LIFTING LUGS. AutoCAD SHX Text.
19 Jul 2017: AutoCAD SHX Text. PLAN. AutoCAD SHX Text. 2% GRADIENT typ. AutoCAD SHX Text.
-show_qsyntax_tree=on