Find out what is closed and when around the City this long weekend.
The City of Melville is delivering traffic signals at the North Lake Road and Winterfold Road intersection.
30 Jan 2025: a. The approved plans, b. Council’s engineering requirements and design guidelines, c. ... 16. Prior to the issue of a Building Permit, plans shall be updated to amend the.
23 Mar 2026: As outlined in the City's Disability Access and Inclusion Plan, we aim to develop more accessible and inclusive playgrounds throughout Cockburn.
20 Jan 2025: Annual Report for Development Contributions Plans. Table 1: Summary of delivery of infrastructure. ... Community Infrastructure Development Contribution Plan 13 (DCA13). Annual Report for Development Contributions Plans.
21 Jan 2025: area boundary. Local Structure Plans (LSPs):. Details on each Structure Plan (including the LSP map and an aerial of the area) are. ... Structure Plan Map. Aerial Photo. Extent of Glamuzina Park Across Adjoining Structure Plans.
24 Jan 2017: COOLBELLUP TOWN CENTRE STRUCTURE PLAN. NOVEMBER 2012. Prepared for: Coolbellup Hotel Pty Ltd. ... LIST OF PLANS Plan 1 ‒ Coolbellup Town Centre Structure Plan Map.
15 Jan 2025: It is an amendment to the local planning scheme that involves zoning land consistent with an approved structure plan and/or local development plans for the same land; and/or is. • ... consistent with an approved structure plan and/or local development plans for the.
16 Jun 1998: The passing of this resolution will overcome that situation. Strategic Plan/Policy Implications. ... a public open space buffer that may be required as part of a revised structure plan for the northern portion of the Packham Urban Development Area around the Watsons’ factory in
23 Dec 2024: This project is well advanced and is ready to commence construction within weeks, with designs, project plans and the community eagerly anticipating construction.
18 Dec 2024: e) With regard to Condition 8, the Fauna Relocation Management Plan must be. ... j) With regard to Condition 16, the Construction Management Plan shall be in.
10 Dec 2024: Revaluingthese non-financial assets every five year is adeparture from AASB116: Property, Plan andEquipment, which would have required the City toassess at each reporting dated whether the carryingamount of the above
-show_qsyntax_tree=on